Oil & Gas
Military Medical Academy
Beograd
Summary
Installation of two 11.6 MW boilers
YEAR: 1967
PROJECT TYPE: New System
OUTPUT
23.2 MW
FUEL
HFO
OPERATING PRESSURE
8 bar
STEAM TEMPERATURE
130°C
APPLICATION
On-site heating
Oil & Gas
Beograd
Installation of two 11.6 MW boilers
YEAR: 1967
PROJECT TYPE: New System
23.2 MW
HFO
8 bar
130°C
On-site heating