Oil & Gas
“Soja Protein”
Bečej
Summary
Reconstruction of the gas line and reconstruction of feed water line
YEAR: 2025
PROJECT TYPE: Reconstruction
OUTPUT
25 t/h
FUEL
Gas
OPERATING PRESSURE
12 bar
STEAM TEMPERATURE
201°C
APPLICATION
Steam production for industrial use