Installation of Mechanical Systems
MIK Projekt provides complete installation and assembly services for industrial boilers, burners and ancillary mechanical equipment, ensuring reliable operation and long-term system stability.
HOW IT WORKS
From Site Survey to Handover
Every installation project follows clearly defined phases — from the first site visit to signed handover documentation.
Site Survey & Scope Definition
MIK Projekt field team assesses site conditions, access constraints, and existing infrastructure prior to mobilization.
Installation Planning
Work sequence, safety plan, coordination with other trades, resource scheduling.
Mechanical Installation
Equipment setting, piping, structural steel, ducts — in scope sequence.
Electrical & Automation Integration
Panel installation, cabling, PLC/SCADA parameterization.
Commissioning & Testing
Hydrostatic tests, valve checks, combustion measurement, first firing.
Handover & Documentation
As-built documentation, operator training, warranty activation.
Comprehensive Installation and Assembly Services
We offer a full range of mechanical installation and assembly services, tailored to the specific requirements of your project.
Every step — from mechanical connection to hydrostatic tests and first firing — carried out by our field team.
We tune combustion parameters on site and verify emissions before system handover.
Assembly and commissioning of gas and oil connection ramps according to project documentation and applicable safety standards.
Assembly of control and distribution electrical panels, cabling and integration into the boiler room automation system.
Assembly and balancing of flue gas, air and process fans, including supports, couplings and vibration isolation.
Fabrication, assembly and sealing of flue ducts and chimneys — from boiler to building outlet, in compliance with emission requirements.
Installation and commissioning of heat pumps — air/water and water/water — with integration into existing or new plant.
Assembly of steel, stainless and insulated piping systems — with all associated fittings: valves, compensators, taps and filters.
Installation of plate and shell-and-tube heat exchangers, recuperators and air heaters, with hydraulic connection and commissioning.
Construction and assembly of steel load-bearing structures, galleries and platforms for equipment within boiler rooms and technical spaces.
Installation of economisers for waste heat recovery from flue gases, with connection to the boiler circuit and BMS integration.
Installation of light and heavy oil, mazut and LNG tanks, including pumping stations for all fuel types with associated fittings and metering.
Integration of PLC/SCADA control systems, sensors and actuators — from installation to parameterisation and testing of the complete boiler room automation.
Commissioning
Our teams carry out complete system testing and optimisation to ensure safe and efficient plant start-up. Every system undergoes a systematic verification protocol before client handover: from hydrostatic tests and valve checks to combustion parameter measurements and final control system adjustment.
System Integration
MIK Projekt ensures seamless integration of all system components and their full functionality within existing industrial plants. Our approach involves coordination with all on-site systems: from feed water and gas installations to automation and remote monitoring systems.
Building reliable systems
that ensure lasting operation
Tell us about your project — we will arrange a site visit and provide an assessment.